ESTIMATING AND COSTING II NOTES

Institution Eldoret National Polytechnic
Course CIVIL ENGINEERING
Year 1st Year
Semester Unknown
Posted By Mwalimu Evans Okoyo.
File Type pdf
Pages 87 Pages
File Size 9.4 MB
Views 3554
Downloads 2
Price: Buy Now whatsapp Buy via whatsapp
  • whatsapp
  • facebook
  • twitter

Description

Cost incurred on site, factors, situations, and items that affect the cost of a project and are temporary in nature but assist in the smooth running of the project. They include hoarding, security, power, and water. They affect the overall cost of the works but cannot be attributed to any particular section of the works.
Below is the document preview.

No preview available
TEC 102: COMPUTERS AND MANAGEMENT OF INFORMATION IN EDUCATION Trending!
UPDATED COMPUTERS AND MANAGEMENT OF INFORMATION IN EDUCATION
38 Pages 3730 Views 9 Downloads 624.16 KB
HTML Basics
UPDATED HTML BASICS NOTES
18 Pages 502 Views 0 Downloads 164.95 KB
Solids And Surfaces Trending!
Updated notes on SolidsAndSurfaces
42 Pages 2927 Views 0 Downloads 1.59 MB
Timber Design Trending!
Updated notes on Timber Design
43 Pages 2832 Views 0 Downloads 480.08 KB
WORKSHOP TOOLS, EQUIPMENT AND MATERIALS Trending!
UPDATED NOTES ON WORKSHOP TOOLS, EQUIPMENT AND MATERIALS
20 Pages 2939 Views 0 Downloads 1.12 MB
DIGESTIVE SYSTEM
UPDATED NOTES ON DIGESTIVE SYSTEM
56 Pages 1485 Views 0 Downloads 973.62 KB
Fluids and pressure Trending!
UPDATED NOTES ON FLUIDS AND PRESSURE
19 Pages 3294 Views 1 Downloads 824.3 KB
INTRODUCTION TO ECONOMICS OF EDUCATION AND HUMAN CAPITAL THEORY Trending!
UPDATED NOTES ON INTRODUCTION TO ECONOMICS OF EDUCATION AND HUMAN CAPITAL THEORY
37 Pages 3685 Views 1 Downloads 602.75 KB
MEASURING AND REPORTING OF INVENTORIES IAS 2 Trending!
UPDATED NOTES ON MEASURING AND REPORTING OF INVENTORIES IAS 2
31 Pages 3433 Views 0 Downloads 854.72 KB
CPA II MANAGEMENT ACCOUNTING Trending!
UPDATED NOTES ON MANAGEMENT ACCOUNTING
668 Pages 3878 Views 1 Downloads 3.8 MB