ESTIMATING AND COSTING II NOTES
| Institution | Eldoret National Polytechnic |
| Course | CIVIL ENGINEERING |
| Year | 1st Year |
| Semester | Unknown |
| Posted By | Mwalimu Evans Okoyo. |
| File Type | |
| Pages | 87 Pages |
| File Size | 9.4 MB |
| Views | 8634 |
| Downloads | 2 |
| Price: |
Buy Now
|
Description
Cost incurred on site, factors, situations, and items that affect the cost of a project and are temporary in nature but assist in the smooth running of the project. They include hoarding, security, power, and water. They affect the overall cost of the works but cannot be attributed to any particular section of the works.
Below is the document preview.
GEOGRAPHY NOTES FORM 1-4
UPDATED NOTES ON GEOGRAPHY NOTES FORM 1-4
468 Pages
668 Views
2 Downloads
4.85 MB
Mathematics Notes F1-4
Trending!
UPDATED MATHEMATICS FI-4 NOTES
662 Pages
9173 Views
0 Downloads
9.09 MB
HISTORY NOTES FORM 1-4
Trending!
UPDATED HISTORY NOTES FORM 1-4
528 Pages
2688 Views
2 Downloads
3.84 MB